top of page

SIDEWALK REPAIR GRANT

About the Sidewalk Repair Grant.

C.A.R.E. Community Foundation is pleased to make possible assistance in improving the condition of our downtown residential sidewalks.

 

Many may be unaware, but by City Ordinance, sidewalk maintenance is the sole responsibility of the property owner. With the age of our historic district, time has taken its toll on the original sidewalks and many are in need of repair for better safety of their use.

 

We are grateful for the tourists we receive visiting our residential areas and the local citizens who choose walking downtown as part of their physical fitness routine. We wish to encourage you to take advantage of this opportunity for improving your sidewalks at a substantial cost savings.

 

There are limited matching funds for this project, and applicants will be accepted on a first come first serve basis. When the job allocation of funds is exhausted, the initiative will cease.

​

Initiative Guidelines:

​

Sidewalk must run parallel to a public street and lie between Tate Street and Seventh Street and Washington Street and Kilpatrick Street.

​

The Initiative will provide matching funds of 60% of total job cost for up to 100 ft., but not less than 40 ft., of sidewalk replacement. Estimated cost is $23.32 per ft. for a depth of 3 ½ inches. (If property lies on a corner lot, consideration of increasing maximum match may be made.)

​

Applicant is welcome to request more than 100 ft. of work, but anything above the maximum match would be paid 100% by the property owner.

DSC02554.jpg
bottom of page